Science Phase 2: Construction Pictures

19 July 2006

These pictures show interior construction within the new part of the Science Building.

Click on any picture for the original, larger version.

Roof (Fourth Floor) Third Floor Greenhouse Second Floor and Courtyard Basement

Roof (Fourth Floor)

Third Floor (Second-floor Roof)


Roof – northwest corner

Roof over computer science, looking eastwards towards the library

006.jpg: Roof above computer science

007.jpg: Existing roof over Science Division Office

010.jpg: Greenhouse floor: the first layer of waterproofing is in place between the bases for individual rooms; the head house is at the far (east) side

011.jpg: A second picture of the greenhouse

017.jpg: Existing roof over Science Division Office serves as a staging area for work on ventilation systems

018.jpg:

019.jpg:

021.jpg:

027.jpg:

028.jpg:

030.jpg:

Second Floor and Courtyard


036.jpg:

Looking northward over the courtyard along the second-floor roof

Looking to the northeast into tourtyard from roof

Looking eastward, along the second-floor roof toward the greenhouse area

Basement


The basement corridor along the mechanical room.


created 21 July 2006
last revised 21 July 2006
Valid HTML 4.01!
For more information, please contact me at (walker@cs.grinnell.edu)