The following pictures show several ground-level views, moving
from west to east.
|
Western and Central Sections along Eighth Avenue
|
Western Section: Forms and rebar at the north part of the building,
looking eastward from the building's western edge
|
|
Looking eastwards from the west into the central section: Rebar mats on
the floor areas mesh with the rebar for beams
|
Western Section: Looking south, this area adjoins the existing chemistry
area. The cones provide inserts into the concrete to provide paths for
utility conduit.
|
|
Central Section
|
Central section, looking south toward Burling: The corridor to the west of
the new courtyard (on left) will help form a clear path from Burling to
the new Campus Center.
|
|
Central section, looking eastward along the courtyard: The wooden form in
the center adjoins a beam, currently shown with 5 large rebar pieces. The
floor decking with additional beams are seen on the left. The Chiller
Plant is ahead in the distance.
|
| Eastern Section: progressing south to north
|
South-eastern section: the metal beams in the foreground will soon support
plywood deck in the central section; the eastern section now serves as
storage for 4x4 supports and other shoring supplies.
|
|
Eastern section: The newly poured concrete wall along the Chiller Plant
completes the poured concrete walls for the building. Later walls will be
brick or other materials.
|
Eastern section: Looking east from the northern part of the construction;
gravel fills the area in the northeast between the building and Eighth Avenue
|
|
Eastern section: A closer view of the gravel in the northeastern part of
the site near the Chiller Plant.
|